Luxury Renovation Solution · Sheffield & South Yorkshire
Bathroom Renovations in Sheffield
Bathrooms stripped back and rebuilt properly, with the waterproofing done right first time.
Most bathroom problems are hidden ones: tiles fixed straight onto plasterboard, no tanking behind a shower, an extractor that vents into the loft, or a wet room former set into a floor that was never levelled. A full strip-out lets the pipework, wiring, ventilation and waterproofing be put right before a single tile is laid.
Wet rooms and level-access showers
Level-access showers need a former set into the floor, a fully tanked substrate and falls formed to the drain. On timber floors that means cutting and reinforcing joists; on concrete it means levelling and tanking. Both are entirely achievable upstairs when the structure is checked first.
Underfloor heating and tiling
Electric underfloor heating under tile is a straightforward upgrade in a bathroom and pairs well with a self-levelling compound and large-format tiles. Tile layout is set out from the most visible wall so cuts land where you do not notice them.
How a bathroom renovations project runs
- 01
Design and specification
Layout planned around existing soil pipe positions, natural light and how the room is actually used.
- 02
Strip-out
Back to the studs or masonry, with waste removed and the rest of the house protected.
- 03
First fix
New pipework, wiring, extraction and any structural or floor levelling work.
- 04
Tanking and tiling
Waterproofing, underfloor heating where specified, then careful tiling and grouting.
- 05
Second fix and handover
Sanitaryware, brassware, glass, lighting and sealing, then a snag walk-through.
Where I work
Bathroom Renovations work is carried out across Sheffield and South Yorkshire, including Dore, Totley, Crosspool, Fulwood, Ecclesall, Ranmoor, Hillsborough and the surrounding villages, plus Rotherham, Chesterfield, Dronfield and Barnsley. See the full service area.
Previous work
Bathroom Renovations projects
FAQ
Bathroom Renovations — common questions
How long does a bathroom renovation take?+
A full bathroom refit is typically 3–5 weeks from strip-out to handover, depending on tiling area and whether the floor needs levelling or reinforcing.
Can I have a wet room upstairs?+
Yes, with proper tanking and a structural check on the joists. It is a common upgrade on Sheffield semis and terraces.
Do I supply the bathroom suite or do you?+
Either. You can choose and supply everything, or I can source through trade accounts — whichever gives you the better result for the budget.
Do I need Building Regulations for a new bathroom?+
Electrical work and new or altered drainage are notifiable, and mechanical extraction is required. These are handled and certified as part of the job.
Can you fit underfloor heating in a bathroom?+
Yes. Electric matting under tile is the usual approach, laid over a levelled floor — there is a full underfloor heating case study on this site.
Enquire

